Product Description:
Detailed Photoes:
Application:
Product Parameters:
Packaging & Shipping:
Installation Instructions:
Installation should be carried in accordance with local standards. Subfloor to be smooth, hard, clean and dry prior to
laying.Where applicable the subfloor must incorporate an effective Damp Proof Membrane. The material must be allowed to
acclimatize 24 hours before installation in a room temperature of between 18 - 24 degree.
Floor Install Accessories:
Product Advantages: